Business case development & simulation
Know what you’re investing in before you commit
See how an automated line could work in your factory before committing to the investment. We model the layout, simulate the process and build a business case using your own production data, costs and targets.
“We simulate the layout and process, then build the business case before our customers commit to the investment.”
What we check in simulation
A simulation runs the whole cycle, with every robot, conveyor, vehicle, load and person moving as it would on site. It shows the problems that are expensive to find after installation.
Live data. We can connect the model to your PLCs and line data, so it follows the plant as it runs.
Example: a four-robot palletising floor
This is a concept layout for a cold-store despatch floor. Four KUKA robot cells palletise cartons from one infeed, an automated vehicle moves the pallets, and a forklift loads out. It was drawn from a sketch of the floor, then built and run in simulation.
Running it found problems that would have been costly on site:
- A vehicle lane that was too narrow.
- A pallet dispenser lowering onto a vehicle as it left.
- A load passing into the forklift carriage.
- Trailer loading positions set too tight.
- A robot path dipping into a high stack.
Each one was found and fixed in the model.




More automation solutions

Building the business case
The business case uses your figures to show what the line costs and what automation would change. It may show that automation isn’t worth the investment for your process. If that’s the case, you’ll know before spending money on equipment.
Where it saves or makes money
- Fewer surprises on site. Problems found in the model are fixed on a screen, not with rework, rebuilt guarding or a second install visit.
- The right size of line. You buy the equipment your rate needs, not more and not less.
- A faster start. Installation starts from a layout that has already been tested, so production starts sooner.
- Labour and output in your figures. The case shows the people each shift needs and the rate the line can hold.
For larger operations
- A case your finance team can check. Capital cost, running cost and payback, set out with your figures and every assumption stated.
- Options compared on the same numbers. Manual, part automated and fully automated, or two layouts side by side.
- Growth tested before it happens. Extra shifts, new products or higher volumes run in the model before you commit.
- More than one line or site. Model the first line, then test the same approach on the next.
What we ask for:
- The process as it runs now, and the people it takes on each shift.
- The rate you need, and the products that run on the line.
- Shifts and operating hours.
- A floor plan or site dimensions, with photos.
- What the current process costs you in time, scrap or downtime.
What you get
How it works
- 1
Send us the details
A floor plan or site dimensions, photos, the products and the rate you need.
- 2
We model the layout
The equipment is placed against your site dimensions.
- 3
We run the simulation
Problems are found and fixed in the model.
- 4
You get the business case
With the drawing, video and proposal, before you commit to anything.
Tell us about the line you are considering
Send us the process and the floor space, and we will tell you whether a simulation is worth doing for your project.
For a study that starts with measuring the process on site, see our automation feasibility study.
We work across Melbourne and regional Victoria, from our facility in Dandenong South.